Overview
This article focuses on Interlock design with hard/soft limits in real industrial scenarios.
Key Points
- Design intent and engineering constraints
- Implementation pattern in PLC/robot controller
- Validation checklist before commissioning
Practical Checklist
Verify safety chain, motion limits, alarm handling, and repeatability before handover.